gravel
Geotechnical
- Jan 29, 2003
- 19
We are involved as civil engineers on site development. Usually the local electrical company does the electric service design af final plan stage. For preparing preliminary cost estimates for various site layout options, we would like some guidelines as to several issue... like spacings/locations of transformer/pads, some unit costs or wire size one would use in a single family development of say 20 half acre lots. The elec is buried service. Any thoughts would be appreciated.. just looking for some rough design parameters that electrical guys see & use. This way we can factor in the electrical as a per lot cost for that particular layout scheme.