grogannc
Structural
- Jan 21, 2014
- 63
I am working on a set of plans for a house where the Architect wants the 2nd story to be formed by rafters with collar tie as the ceiling line. Collar tie is about 1/3 from the top. Span is huge, about 30 ft wide. I think I'm OK with the "standard" version of this(there are CJs below), using 2x10 rafters with 2x10 tie, but at the dormers (I know great right?) I have a double 9.25" LVL rafter/tie frame and the thrust at the tails is about 1500 lbs.
Do you guys have any tricks for dumping this into the wall.? Of course its open in this area and all I have to work with down below is a balcony on one side.
Do you guys have any tricks for dumping this into the wall.? Of course its open in this area and all I have to work with down below is a balcony on one side.