phanhung
Materials
- Jul 30, 2006
- 30
Hi
i am working with dynamic/explicit problem, the analysis took me a long time. I got the result in 1 second, and now i want to increase the time into 2 seconds, if i start to run from the begining, i take a lot of time! i would like to run my analysis after frist 1 second, how should i do.??
i am working with dynamic/explicit problem, the analysis took me a long time. I got the result in 1 second, and now i want to increase the time into 2 seconds, if i start to run from the begining, i take a lot of time! i would like to run my analysis after frist 1 second, how should i do.??