Bhotar3
Civil/Environmental
- May 6, 2013
- 62
Client is building 11'-0" retaining wall (attached) at his property. Contractor pours footing, but instead of installing the dowels according to drawing (#8s 8" O.C. 5'-0" dev. length ), He installs #5s with only 2'-0" development. Vertical portion has not yet been installed.
Assuming the #5s will not work (i've not yet run the numbers), what are my options here?
Is there a post-install dowel solution that would resist the moment at the base of the wall? I also thought about helical tie-backs.
I appreciate any feedback.
Assuming the #5s will not work (i've not yet run the numbers), what are my options here?
Is there a post-install dowel solution that would resist the moment at the base of the wall? I also thought about helical tie-backs.
I appreciate any feedback.