ctopher
Mechanical
- Jan 9, 2003
- 17,456
Has anyone come up with a way to change the Rev Table to show the date as 09-07-04? This is the standard our corp wants us to use. The default of the table is 9/7/2004. I have searched everywhere and have not found a solution.
thanks
thanks