philoshophy
Civil/Environmental
- Jan 30, 2007
- 23
Hi dear all
greetings.
I have attached my HEC-RAS model. The reasult seem to be quite unrealistic. I could not figure out how to handle the problem. If some one have solution please give a favor. The model is preparing for bridge design in Hardin Creek within Napa Watershed. Actually I am dealing with 100 year flow of 1134 cfs.
I will be waiting the clue from you guys.
'
Thanks
greetings.
I have attached my HEC-RAS model. The reasult seem to be quite unrealistic. I could not figure out how to handle the problem. If some one have solution please give a favor. The model is preparing for bridge design in Hardin Creek within Napa Watershed. Actually I am dealing with 100 year flow of 1134 cfs.
I will be waiting the clue from you guys.
'
Thanks