DDerek
Computer
- May 2, 2024
- 5
How can I replace a linked component inside of my 2D sheet with its newer revision. Some of our older drawings created a link between the model and drawing sheet rather then adding the model as a component of the drawing sheet so it's easily replaceable by the newer rev. I cannot figure out how to alter this link outside of reving the model while you have the sheet loaded, is there a way?
Thanks.
Thanks.