any good equation for estimating riprap size around pump station discharge basin apron? The discharge basin itself is concrete one, and from there the discharged water will be spilled out to riprap apron/chute.
I guesss I can not use the river bank revetment protection equation since there will be a lot of turbulence flow involed in my case.
thanks.
I guesss I can not use the river bank revetment protection equation since there will be a lot of turbulence flow involed in my case.
thanks.