Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations KootK on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Rock Anchors

Status
Not open for further replies.

spaseur

Structural
Oct 13, 2008
26
I am designing a mat foundation using SAFE. We have significant overturning issues and are considering using rock anchors into the bedrock that our foundations are bearing on. We are wanting to model the rock anchors as springs. We are looking at #10 bar. How would you determine the spring constant for these rock anchors? Ks=AE/L but what L do you use?
 
Replies continue below

Recommended for you

Best you talk to a local geotekkie... they are likely familiar with the rock mechanics of the local bedrock...

Rather than think climate change and the corona virus as science, think of it as the wrath of God. Feel any better?

-Dik
 
Agree with Dik that this needs to be confirmed by a geotech, but a good starting point to estimate the active length of the anchor is:
[active length] = [unbonded length] + 1/2 [mobilized bonded length].
 
Thanks... I've just used the unbonded length.

Rather than think climate change and the corona virus as science, think of it as the wrath of God. Feel any better?

-Dik
 
By only assuming the unbonded length for your AE/L calc you could be cranking too much stiffness by way of too short a length. Suggest you use a sensitivity of L.unbonded to L.total. Using L.total may seem excessive but rock is not a homogeneous material and filled with potential imperfections that require movement to completely mobilise the anchor tensile capacity. I guess your L.bonded stiffness will keep you conservative until you receive advice from your geoteqq.
 
concur... Thanks... go by the installed tension load... I guess based on a longer installed length.

Rather than think climate change and the corona virus as science, think of it as the wrath of God. Feel any better?

-Dik
 
Just to be clear. When you say unbonded length, you are referring to the length of the rock anchor not bonded to the competent rock. Correct?
 
That's correct with an additional length equal to half the bonded length... that accounts for a little extra 'stretch'.

Rather than think climate change and the corona virus as science, think of it as the wrath of God. Feel any better?

-Dik
 
Don't forget as well that if you have preloaded anchors (in most situations you will), that you need to consider this in the stiffness. Until you exceed the preload force there is no movement. Unsure if safe does nonlinear springs.

If not it would be an iterative approach, find reactions, alter to secant stiffness, rerun, iterate until convergence.

 
Status
Not open for further replies.

Part and Inventory Search

Sponsor