Can someone help to clarify the "Primary Drainage System" as described for roof ponding requirements?
I have a roof with 1/4" per foot slope to the interior of a building, where roof drains are located (The interior is 1'-3" lower than the permeter).
My question is that if we provide a secondary, or overflow scupper, and this is elevated like 2" above the primary drain, can this drain be tied into the main drain stack below the roof? If so, can I only design the roof for 2" of water, vs almost 1'-3". Or do we need to provide a completely separate drain system (ie 2-full runs of pipe) to be able to do this?
I have a roof with 1/4" per foot slope to the interior of a building, where roof drains are located (The interior is 1'-3" lower than the permeter).
My question is that if we provide a secondary, or overflow scupper, and this is elevated like 2" above the primary drain, can this drain be tied into the main drain stack below the roof? If so, can I only design the roof for 2" of water, vs almost 1'-3". Or do we need to provide a completely separate drain system (ie 2-full runs of pipe) to be able to do this?