DrillerNic
Petroleum
- Jul 1, 2004
- 454
I've got an unusual liner on my next well- when the liner shoe reaches open hole, we'll still have 2000ft of liner to run. I'm wondering how we can ream this liner in while we're still running it! The Tesco Casing Drilling thing will be difficult due to stack up height on the rig...I'm thinking of connecting a water bushing on the top drive, making up a joint, connecting the bottom connection of the water bushing, reaming, undoing the water bushing and making up the next joint and so on.
Anybody got any other ideas?
Anybody got any other ideas?