Not sure this is quite the right forum, but I'll give it a shot...
I’m looking for some quick “gut check” type rules-of-thumb for estimating engineering design effort on projects. I recognize that a proposed fee needs to be based on the estimated effort to complete a given scope of work, but what about coming up with a quick estimate of effort?
Do you use percentage of construction cost?
Do you base it on number of plan sheets expected?
How do you separate preliminary design effort from the final design effort?
Thanks for your thoughts!
I’m looking for some quick “gut check” type rules-of-thumb for estimating engineering design effort on projects. I recognize that a proposed fee needs to be based on the estimated effort to complete a given scope of work, but what about coming up with a quick estimate of effort?
Do you use percentage of construction cost?
Do you base it on number of plan sheets expected?
How do you separate preliminary design effort from the final design effort?
Thanks for your thoughts!