A contractor installed a new HVAC unit in an existing building, which hangs from the inside roof structure. The roof structure has horizontal cross bracing and each set of cross braces has a sag rod in the middle. The cross bracing bay size is 16'x16'. The new HVAC unit will prevent re-installation of the sag rod for this cross bracing. The cross bracing is L3x3x1/4 connected to the bottom chord of the open web steel joists.
At what point do members need sag rods? I'm thinking of ignoring this sag rod instead of trying to attach something to the bottom of the HVAC unit.
At what point do members need sag rods? I'm thinking of ignoring this sag rod instead of trying to attach something to the bottom of the HVAC unit.