EngMan40
Civil/Environmental
- Jan 11, 2009
- 66
what concrete strength is high enough when considering the lateral resistance of a cantilevered soldier pile and lagging yet low enough so soldier piles can be removed from their caissons with a backhoe? I am trying to see how much steel can be salvaged I am thinking of 500 psi is a happy medium, any thoughts on this?