Does anyone know of a good method to control flow in a sandwich structure (VARTM)?? I'm mainly concerned with the bottom flow either being too slow and not finshing before the top flow reaches the vent OR the bottom flow being too fast and closing off the vent before the top flow reaches it.
I've seen some use multiple vents and injection ports, but not sure exactly how they set it up and how they know when to clamp which vent.
Thanx - Barry