Hey
My problem with Sap2000 V11 is this one:
with the command Assign> Frames> Insertion Point I fixed the rolled in the down part of the edge of a beam.
Thus if afterwards I try to draw a cable in the edge of this beam (but in the up part of the beam) the program automatically begins the designing of this cable from the point that I fixed the rolled (in the up part of beam).
My question is simple:
Has the program sap2000 V11 the possibility to have at once in the down part (in the edge of a beam) a rolled fix and in the up part (in the edge of a beam) a beginning of a cable?
Follows drawing
Thank you
Giannis
My problem with Sap2000 V11 is this one:
with the command Assign> Frames> Insertion Point I fixed the rolled in the down part of the edge of a beam.
Thus if afterwards I try to draw a cable in the edge of this beam (but in the up part of the beam) the program automatically begins the designing of this cable from the point that I fixed the rolled (in the up part of beam).
My question is simple:
Has the program sap2000 V11 the possibility to have at once in the down part (in the edge of a beam) a rolled fix and in the up part (in the edge of a beam) a beginning of a cable?
Follows drawing
Thank you
Giannis