wolfhnd
Civil/Environmental
- Aug 2, 2002
- 72
My geo tech wants me to include a special provision in a contract telling the contractor not to work on a slide if the soil is saturated. He offers no ideas on how the contractor is to know when the soils are saturated. I could use embankment control stakes but if it's moving I'm in trouble anyway. What do I require to measure saturation 20' under a roadbed?