I am looking at a job where the supply line is a 6" schedule 40. The owner will be changing to to a schedule 80 and we plan to connect to that to supply the fire sprinkler system. My question is, is schedule 80 allowed for underground piping to supply the fire sprinkler. Or is C900 the only piping allowed? Is there any specific code for this? It seems that the schedule 80 (grey) has a higher PSI rating than the C900 - any help would be greatly appreciated