raydefan
Civil/Environmental
- Dec 14, 2004
- 59
How can the controller of an existing 8-phase operating intersection be modified to accommodate an exclusive “scramble” phase? Since all eight phases are currently being used, would the scramble phase require an additional (9th) phase or can this be accommodated with the existing Type 170 controller and/or some auxiliary equipment?