Hello all,
would you guys specify battered piles at the ends for lateral load transfer into soil using screw piles? or would the lateral load be transfered into the grade beam that is perpedicular to the lateral load? (concrete grade beam is pushing against the soil, spanning horizontally and bending about its weak axis)
one storey building, plus 6 ft metal wind wall on roof. Roof is used for playground, main floor is slab on grade used for storage. low seismic low wind area.
thanks!
would you guys specify battered piles at the ends for lateral load transfer into soil using screw piles? or would the lateral load be transfered into the grade beam that is perpedicular to the lateral load? (concrete grade beam is pushing against the soil, spanning horizontally and bending about its weak axis)