maintennance
Mechanical
- Jan 26, 2008
- 46
For the coker unit feed pump, as per licensor document the seal flush plan is 11,52. The service fluid temperature is 200 deg C ( normal) and (max) 260 deg C. One seal vendor offer the same seal flush plan as indicated where as the other seal vendor offers 23,52. It is obvious that since the temperature is high the second vendor is offering for 23 seal flush plan. What could be different in design between these seal vendors How come the pioneers of the seal manufacturers differ in their recommendation? I would also like to know what would be probable reasons to go in for 11 seal flush plan eventhough the temperature is high as indicated above. Thanks to clarify