pno1899
Chemical
- Aug 18, 2015
- 5
Hi dears,
i have a project related to seal oil gas carry over with sweet oil in reservoir,
on a synthesis compressor consisting of three vertical split casing(suction pressure=25kg/cm2 and Discharge pressure=150kg/cm2) wet oil seal are used, complete seal oil system is working properly, differential pressure for seal rings across each casing is stable.
but the problem is that there is gas explosivity in sweet oil reservoir with previous 2 time explosion background.
observations include very small quantity of sour oil
i have a project related to seal oil gas carry over with sweet oil in reservoir,
on a synthesis compressor consisting of three vertical split casing(suction pressure=25kg/cm2 and Discharge pressure=150kg/cm2) wet oil seal are used, complete seal oil system is working properly, differential pressure for seal rings across each casing is stable.
but the problem is that there is gas explosivity in sweet oil reservoir with previous 2 time explosion background.
observations include very small quantity of sour oil