There are 4 new spools to be fabricated and installed as boiler external piping. Shop fabrication is welded, field installation is mechanical assembly (flanged and bolted) only. I understand that Form P-4A is needed for fabrication, but is From P-4B needed for field installation of these spools? If so, is a field hydro test required if a shop hydro was done for fabrication?