nadfourchon
Petroleum
- May 20, 2008
- 26
If I have a WPS using GTAW root and hot pass and SAW fill and cap that only states 1G position can I weld the GTAW root and hot passes in the 5G position? Is this legal in ASME Section IX? If so where in Section IX can I find this?