I am working on a relatively small, aprozimately 2 acre pond, dredging project in upstate New York; and I am trying to find a way to keep sediment from flowing out of the outlet weir. I've been looking at turbidity curtains but I don't think I can use them across a flowing watercoarse. I know they could use the turbidity curtain if they broke the work up into a couple phases, probably at least 4, but I think that seems a bit excessive for the job.

Does anyone have any ideas how I can keep the dirty water in the pond and allow the clean water to continue flowing out.

Thanks
 
Replies continue below

Recommended for you

Use your turbidity curtains on either side of a channel through the pond to the weir. Work outside of the channel will have a chance to settle or filter prior to leaving pond.
 