ACI 301 and other spec guides talk about segregation, but the discussion seems very subjective.
What hard tools does the inspector have to accept or reject ready-mix concrete based on segregation.
My question comes from concern about a project where fresh concrete will be transported in a 1-yard bucket about 25 minutes up a rough-terrain road using a forward-reach forklift ("GradAll")?
What hard tools does the inspector have to accept or reject ready-mix concrete based on segregation.
My question comes from concern about a project where fresh concrete will be transported in a 1-yard bucket about 25 minutes up a rough-terrain road using a forward-reach forklift ("GradAll")?