Jackcsh
Structural
- Dec 2, 2006
- 15
According to AASHTO 3.10.9.2 and 4.7.4.3 it seems that if a bridge is in seismic zone 1, no seismic analysis is required except for a connection load at the bearings and a minimum bearing length requirement. Does this mean that the piers and abutments do not have to be checked for any seismic loads? Some coworkers say you still have to check foundations for 0.25*permenent load.