Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations KootK on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Seismic loads with Profis

Status
Not open for further replies.

skeletron

Structural
Jan 30, 2019
846
The Profis program indicates that for seismic analysis the steel has to fail (highest utilization) before the concrete. I understand the hierarchy of the failure mechanism, however, I can never get the utilizations to work out in practical situations. As I play with it, it seems that you would have to have deep embedment, lots of edge, perfect spacing, and small diameter anchors. I'm wondering if this is the case for others.

My situations are usually wall mounts with very light tension loads (everything is <30% capacity) and the seismic requirements for these structures is limited.
 
Replies continue below

Recommended for you

You are referring to the ductile failure requirement in Appendix D, Read this blog post: Link
 
The steel should fail first only if you require ductility out of the connection. As you have found, it is generally more practical to design post-installed anchors for overstrength level forces so that the hierarchy requirements can be neglected.
 
Status
Not open for further replies.

Part and Inventory Search

Sponsor