With respect to seismic site classification,does it make any difference if your foundations are placed on piles which are driven to bedrock?
Let's say I did a site classification based upon SPT, and found the average N in the first 100 ft to be 25. There is soil for the first 50', and bedrock for the next 50', which the piles are driven into.
Basically, can I get away with classifying the site as Class B (or even A for that matter)?
Is the 10' of soil between the rock surface and bottom of spread footing include the pile?
Let's say I did a site classification based upon SPT, and found the average N in the first 100 ft to be 25. There is soil for the first 50', and bedrock for the next 50', which the piles are driven into.
Basically, can I get away with classifying the site as Class B (or even A for that matter)?
Is the 10' of soil between the rock surface and bottom of spread footing include the pile?