I have an extremely large industrial building. with purlins running at 2.4 m c/c, continuous over all beams/girders. the purlins are about 12" deep with a metal decking on top.
My question is how can I determine if the purlins are capable of transferring the load to and from the decking into my LLRS or should I not consider it a diaphragm to the building at all with such a high purlin offset?