mad2323
Geotechnical
- Sep 8, 2016
- 8
I have a site that will have 6 ft of fill placed over 6-feet of loose fine-grained sand with N value of 3 with water at the ground surface. I have looked at a schmertmann approach and came up with less than 1 inch of settlement but I'm not buying it. Any thoughts out there?