Hi,
We have a site where the existing material is organic, silty and which is replaced with compacted structural fill. There is an additional 10 ft of fill as well. Do we need to wait 2 months to build on it. Or can we monitor settlement daily and begin construction after 30 days.
We have a site where the existing material is organic, silty and which is replaced with compacted structural fill. There is an additional 10 ft of fill as well. Do we need to wait 2 months to build on it. Or can we monitor settlement daily and begin construction after 30 days.