For a sewer lift station with duplex centifugal pumps in the wetwell I am unsure of the best option for the gravity inlet pipe. I only have about 20 LF of pipe between a screen plant and the wetwell. I want to avoid turbulance in the wetwell created by the gravity inlet. I can either have the inlet pipe at a mild slope to decrease inlet velocity but have a 4-ft freefall or have a steep slope (25%+) with the IE at the pump off elevation. In one scenario I have a free-fall which may entrain air and in the other scenario I will have a high inlet velocity(12 fps+) which could create turbulance.
My thought is to avoid free fall and go with the steep slope and install a baffle on the outlet to reduce turbulance/swirling. Any other ideas or thoughts? (The wetwell is going to be 10-ft dia., inlet directed to center of the two pumps).
My thought is to avoid free fall and go with the steep slope and install a baffle on the outlet to reduce turbulance/swirling. Any other ideas or thoughts? (The wetwell is going to be 10-ft dia., inlet directed to center of the two pumps).