Bonjour
In the new gas treatment plant located in Algeria (JV), the first gaz was exported in the mid of December 2017) , two weeks ago from now , during the operation of the Solar turbine Generator it was happened a serious problem for two machines (09 MW by machine), that was the shearing bolts of the fixation of the coupling between the turbine and the generator
The investigation is ongoing to find the real causes of this failure by the Client /Contractor
May be someone met the same problem in the past that could give me his feedback about an idea about the failure , causes and the solution implemented to solve this problem definitely
Thank you in advance for your feed back
Best Regards
Djamel