Dear experts,
During construction a new tank, by mistake my subcontractor install the wrong shell plate (1 plate only) in the first course. All verticals have been completely welded.
We are not allowing them to erect the 2nd shell course till the wrong plate is replaced.
The correct plate is available. We have to cut the 2 verticals (V3 and V4), remove the wrong plate and insert the correct one. There would be 2- verticals welding on the same location (V3 and V4). The width of the shell is 2100 mm.
My concern is this V3 and V4 have been welded, flame cut and again re-weld.
Is there any restriction in API 650 or 653 in regards to the above issue
Syah
During construction a new tank, by mistake my subcontractor install the wrong shell plate (1 plate only) in the first course. All verticals have been completely welded.
We are not allowing them to erect the 2nd shell course till the wrong plate is replaced.
The correct plate is available. We have to cut the 2 verticals (V3 and V4), remove the wrong plate and insert the correct one. There would be 2- verticals welding on the same location (V3 and V4). The width of the shell is 2100 mm.
My concern is this V3 and V4 have been welded, flame cut and again re-weld.
Is there any restriction in API 650 or 653 in regards to the above issue