nampar
Structural
- Oct 15, 2019
- 6
Hi,
I am currently working on a project where the contractor has mistakenly punched about 6 shot-pins in the bottom flange of an existing SMF beam within the protected zone. It is a Wuf-w connection. This SMF must have been installed a few years back and we do not have calcs or dwgs for the same. Can anybody provide guidance on how to approach this?
I am currently working on a project where the contractor has mistakenly punched about 6 shot-pins in the bottom flange of an existing SMF beam within the protected zone. It is a Wuf-w connection. This SMF must have been installed a few years back and we do not have calcs or dwgs for the same. Can anybody provide guidance on how to approach this?