I am fairly new to WaterCAD and have a question:
how do I change a Junction point to a reservior (or whatever else I need)

any help you can give would be greatly appriciated!
 
Replies continue below

Recommended for you

You can just select the reservoir tool and click on the junction you want to replace. WaterCAD will prompt you to confirm if you want to morph the junction to a reservoir, so just hit "Yes".
 
Which, by the way, will work for any element type.
 
I used watercad 7 without any problem. Now company upgrade tp watercad xm 8, I dont know how to print out detailed table. I dont want flextable.
Please help
 
You can select Report --> Element Tables --> Pipe (for instance). this will open the flex table for you. Just edit the table to place the fields you want to include in the report.

Then click on the Report button (the third one from right) and select to Report the current time step.. a window shall pop out.. edit the header and footer and save the file as PDF if you wish to.
 
Hello melkordy, thanks very much for your input. I do appreciate that.
You probably are very much fluently in watercad. You remembered in watercad 7, when you wanted to print out tables, watercad 7 gave you options, either detail table or flex table. However, WaterCad 8 doesnt give you those options but Flex table only.
I'd like to use Detail Table in my reports.
 
 http://files.engineering.com/getfile.aspx?folder=d6fbcca0-5011-4fcd-a3a2-2c1dc8a2605a&file=C350_SOUTH17693.jpg
I have been using watercad and watergems v8 for 4 years but I have never used watercad 7 :)

can you tell me how would you like the report to be?

There are other reports available in the Report menu like Scenario Summary and Project Inventory reports..

you can also ask in the Bentley communties
or search their technotes and FAQs, hey are really usefull
 