edison123
Electrical
- Oct 23, 2002
- 4,426
I need 11 KV, 95 sq mm copper cable for connecting my 11 KV test generator to 11 KV motors for no-load tests. The machines are about 10 meters apart. The whole test duration will be for about 3 hours continuous and the cables will be laid on ground and will be exposed with the test area cordoned off.
What are the + and - of
Single core vs Three core?
Armored vs Unarmored ?
Muthu
What are the + and - of
Single core vs Three core?
Armored vs Unarmored ?
Muthu