gibran_alves
New member
- Dec 5, 2021
- 13
hello everyone!
I have a doubt about sizing empennage, not the convetional ones, but, for example, a H or a butterfly ones.
My doubt is: according to the authors that I read, you can use the same procedure used to estimate a convetional one, but if I find a area, example for a H empennage with 1 square meter, should I use 1 square meter on both sides or I must to split the area in two parts 0.5 square meters for each side (in this case a vertical empennage)?
thanks for reading
I have a doubt about sizing empennage, not the convetional ones, but, for example, a H or a butterfly ones.
My doubt is: according to the authors that I read, you can use the same procedure used to estimate a convetional one, but if I find a area, example for a H empennage with 1 square meter, should I use 1 square meter on both sides or I must to split the area in two parts 0.5 square meters for each side (in this case a vertical empennage)?
thanks for reading