Anjalirb
Aerospace
- Jul 28, 2010
- 9
I have drawing X and drawing Y. Drawing X has a Base View with a sketch tied to it. Is there a way to copy some of those sketch curves (or the entire sketch itself) to a different Base View in Drawing Y (a differen file)?
If you add basic curves thru Expand Member View, you can copy/paste to other drawings or views.
I've set the WCS to Absolute in both files before copy/pasting the individual curves. You cannot convert the sketch curves to Model using VDE either. And you cannot copy the entire sketch feature since it is not part of the Model History. Any ideas?
We are running NX6.0.5.3, MP 3 -
Thanks in advance!
If you add basic curves thru Expand Member View, you can copy/paste to other drawings or views.
I've set the WCS to Absolute in both files before copy/pasting the individual curves. You cannot convert the sketch curves to Model using VDE either. And you cannot copy the entire sketch feature since it is not part of the Model History. Any ideas?
We are running NX6.0.5.3, MP 3 -
Thanks in advance!