I'm involved in a project where a debate has sparked off on whether we should be cast a ground floor suspended slab on built up grade or using a profiled metal decking on block walls.
The FFL is sitting approximately 1500mm above natural ground levels, and one proposal is to use site won material retained, compacted etc to bring up the levels for a piling and footing system. The other option is to pile, cast the footings and bring up the levels using concrete blocks and supporting profiled metal decking. Just trying to gauge other peoples experience here as both options have their inherent disadvantages & advantages. Any thoughts or recommendations would be appreciated. Builder is still to be appointed....
The FFL is sitting approximately 1500mm above natural ground levels, and one proposal is to use site won material retained, compacted etc to bring up the levels for a piling and footing system. The other option is to pile, cast the footings and bring up the levels using concrete blocks and supporting profiled metal decking. Just trying to gauge other peoples experience here as both options have their inherent disadvantages & advantages. Any thoughts or recommendations would be appreciated. Builder is still to be appointed....