Good day.
I don't have that much experience with slabs on grade.
What I am facing is the following
The design drawings are indicating a slab on grade for a residential house with ground beams to tie the columns. The slab on grade is separated from the ground beams and the columns by a separation joint of 20mm. the thing is that the client doesn't want that much joint and would like to remove them.
Removing joints will result in restraining the slab from contracting due to drying shrinkage which will increase the stresses due to shrinkage / temperature.
I was reading the ACI360R which deals with the design of slabs on grade. There is the formula of subgrade drag which depends on the joint spacing. A joint is defined as the length between the free ends of the slab. In my case, I have no free joint since it will be connected to the ground beams.
In my case, I doubt that I can use the subgrade drag procedure since no free joint is in this structure. What is an alternate solution ?
I have already sent the request to the design office but I would like to hear your thoughts about the above. Thank u
I don't have that much experience with slabs on grade.
What I am facing is the following
The design drawings are indicating a slab on grade for a residential house with ground beams to tie the columns. The slab on grade is separated from the ground beams and the columns by a separation joint of 20mm. the thing is that the client doesn't want that much joint and would like to remove them.
Removing joints will result in restraining the slab from contracting due to drying shrinkage which will increase the stresses due to shrinkage / temperature.
I was reading the ACI360R which deals with the design of slabs on grade. There is the formula of subgrade drag which depends on the joint spacing. A joint is defined as the length between the free ends of the slab. In my case, I have no free joint since it will be connected to the ground beams.
In my case, I doubt that I can use the subgrade drag procedure since no free joint is in this structure. What is an alternate solution ?
I have already sent the request to the design office but I would like to hear your thoughts about the above. Thank u