I have a 4000 sf office building with glulam columns forming an inner and an outer ring in the center of a square footprint. The rings are 7 feet apart. The exterior walls are wood stud framed. I have a few interior wood framed shear walls. At the request of the contractor and architect I am using a monolithic slab and footing configuration for the column footings (column reaction is 18 kips max). The interior shearwalls are located on 3 sides of the outer ring and I have a thickened slab under the shearwalls with a footing at each end (also a thickened slab).
Now to my question, with all the thickened slab areas, 12 columns in the outer ring, 8 columns in the inner ring, and pretty much 12 inch wide thickend slab under the shearwalls that are between each outer ring column on 3 sides, how do I cut contraction joints in this slab. Can I saw them through a thickend slab without increasing the depth of the cut? Instead of a 4 inch slab should I go thicker and add more reinforing at the top, cut the joints through the thickend areas and just try to limit the crack width.
Or should I completely isolate the thickened areas from the rest of the slab. Essentially pour a C shaped footing, top of footing is top of slab, construction joint that where appropriate, then pour the 4 inch slab up to that footing ring?
Or am I worrying about it too much. Slabs crack, just try to limit the width.
Now to my question, with all the thickened slab areas, 12 columns in the outer ring, 8 columns in the inner ring, and pretty much 12 inch wide thickend slab under the shearwalls that are between each outer ring column on 3 sides, how do I cut contraction joints in this slab. Can I saw them through a thickend slab without increasing the depth of the cut? Instead of a 4 inch slab should I go thicker and add more reinforing at the top, cut the joints through the thickend areas and just try to limit the crack width.
Or should I completely isolate the thickened areas from the rest of the slab. Essentially pour a C shaped footing, top of footing is top of slab, construction joint that where appropriate, then pour the 4 inch slab up to that footing ring?
Or am I worrying about it too much. Slabs crack, just try to limit the width.