we rarely get this condition, but i frequently see on other's drawings the slab on metal deck placed over load bearing walls with no positive connection to the wall prior to placing the slab.
the attachment is sometimes made with a dowel from the masonry wall to the slab, otherwise, the deck is resting on the wall.
I would think for erection safety it would be necessary to weld or screw the deck down. Am i missing something?