-
1
- #1
IYIeI2cY
Structural
- Apr 26, 2002
- 49
Hello all,
I need to design a flexibile retaining wall (soldier piles with wood lagging), all the text books i have do not proper handling of this issue, just some formula in very basic situations and wihout solved examples.
Can any one tell me how can i find solved examples for that issue?
My problem is i need to excavate for about 4 meters, i will use I beams verticaly every 2.4 or 3 meters, with wood sections as horizontal elements. the first 2 meters of the soil are sand, then clay, the water table level is in the middle of sand layer.
Fast help is appreciated.
I need to design a flexibile retaining wall (soldier piles with wood lagging), all the text books i have do not proper handling of this issue, just some formula in very basic situations and wihout solved examples.
Can any one tell me how can i find solved examples for that issue?
My problem is i need to excavate for about 4 meters, i will use I beams verticaly every 2.4 or 3 meters, with wood sections as horizontal elements. the first 2 meters of the soil are sand, then clay, the water table level is in the middle of sand layer.
Fast help is appreciated.