BINGMD
Electrical
- Jul 26, 2005
- 37
I am working on a 100 MW boiler proposal. In order to estimate annual coal cost, we need to know how long we will run the sootblowers. I have 52 sootblowers. Can I assume each sootblowers need 2 minutes to finish sootblowing, so total sootblowing time per shift would be about 100 minutes? I have no operation experience, so I hope to get advice from people with real experience to confirm my assumption. Thank you very much.