Imran Structural Engineer
Civil/Environmental
- Jun 8, 2021
- 28
I am planning a bridge over a waterbody. The high flood level is 15meter. I've attached images with two possible configuration, one with pier in middle with height of 28.4 meter while other configuration avoids the deepest part by 3.4m in height. There is an existing older bridge at downstream with pier in the middle. Superstructure is discontinuous with 35m box girders and the radius of curvature is 60m. Can anyone give suggestion regarding pros and cons that would help me finalizing the configuration.
Any sort of help would be highly appreciated.
Regards