miguelandrade
Mechanical
- Mar 28, 2013
- 26
Hello,
We are about to start to mount the metalic structure of a 50m tal building. (12 floor above 00m, 2 floor under 00m). Under ground levels are under construction using slurry wall techinique. Building foundations are reinforced concrete piles. Metallic columns are attacched (welded) to steel armour from the reinforced pile before being placed down. Concrete is poured through the steel column up to -2 floor for the pile concrete and up to 0 floor inside the metalic column.
An special issue from this project is that because of the two underground levels and its construcion technique, the crane tower could not be anchored to any reinforced concrete foundation at a 00m level. It is needed to be fixed to a structural system atached to the beams and columns from 0 floor and -1 floor (-2 floor is a concrete slab).
Any experience for this kind of project? We already have a possible mounting plan, but it will be usufull to know prior experience from you.
Thanks a lot!
We are about to start to mount the metalic structure of a 50m tal building. (12 floor above 00m, 2 floor under 00m). Under ground levels are under construction using slurry wall techinique. Building foundations are reinforced concrete piles. Metallic columns are attacched (welded) to steel armour from the reinforced pile before being placed down. Concrete is poured through the steel column up to -2 floor for the pile concrete and up to 0 floor inside the metalic column.
An special issue from this project is that because of the two underground levels and its construcion technique, the crane tower could not be anchored to any reinforced concrete foundation at a 00m level. It is needed to be fixed to a structural system atached to the beams and columns from 0 floor and -1 floor (-2 floor is a concrete slab).
Any experience for this kind of project? We already have a possible mounting plan, but it will be usufull to know prior experience from you.
Thanks a lot!