DougB
Geotechnical
- Feb 14, 2003
- 5
What do you consider a reasonable maximum organic content to specify for engineered fill placed under a building foundation? Material in question is a silty clay bordering on a silt. I am expecting 0 to 6 feet of fill under the footings (ie depth varies). 2 story wood frame construction for condominiums.