I have contractors blasting and painting the inside tank bottom with Jotun Tank Storage Comp A. However, I need the tank to be in service sooner than expected. The paint has to be applied when the RH is < 85%. The various drying times reduce as the temperature increases.
Are there any innovations I can employ to the inside of my tank to drop the humidity and increase the temperature at night, so I can paint at night? I do not have access to an industrial dehumidifier. The heating and de-humidification has to be done evenly so as to ensure proper paint application throughout. Anything I should consider?
I have contractors blasting and painting the inside tank bottom with Jotun Tank Storage Comp A. However, I need the tank to be in service sooner than expected. The paint has to be applied when the RH is < 85%. The various drying times reduce as the temperature increases.
Are there any innovations I can employ to the inside of my tank to drop the humidity and increase the temperature at night, so I can paint at night? I do not have access to an industrial dehumidifier. The heating and de-humidification has to be done evenly so as to ensure proper paint application throughout. Anything I should consider?